LLC BratskChemSyntez
In 2014, the Pharmasyntez Group of Companies started construction of a plant in Bratsk. The first stage of the plant was finished in 2016. A utilities preparation section, laboratories, a small scale production unit were completed by that time. Immediately after that, the second stage works started.
In 2017, all necessary licensing procedures were completed, and a pilot production department for the development of substance manufacturing technologies was put into operation.
On November 26, 2020, the second stage of the plant was launched. Vladimir Putin, President of the Russian Federation started a new production online.
IVAN SERGEEVICh DRACKIJ
Chief Executive Officer of
Equipment
From European, Indian, and Chinese manufacturers
- Swiss Glascoat Equipments Ltd.
- Buchiglas
- Julabo
- Block
- Zibo Taiji Industrial Enamel Co., Ltd
BratskChemSyntez
Built-up territory: 38,000 m2
Production
Drug substances for antineoplastic, anti-TB, antiretroviral, and anti-COVID drugs.
Dosage forms
Drug substances